Client: Roads and Maritime Services
Duration: 69 weeks
Location: Thunderbolts Way 5Km West of Gloucester
- Road upgrade to approximately 250m either side of a 108m long super T girder bridge over four spans.
- Works include but not limited to, construction of the bridge over the Barrington River, earthworks, pavements, stormwater, traffic and environmental management and landscaping
- The project was particularly sensitive from an environmental perspective due to the vulnerable Southern Myotis (micro bat) habitat under the existing bridge and also maintaining passage for the Bass to migrate the river.